Region 1 Planning Council's 2025 Federal Funding Application

Application Form

Welcome to the Region 1 Planning Council’s (R1) application portal for the 2025 MPO-attributable funding project solicitation.  All public local agencies eligible to receive FHWA Federal Aid transportation assistance may apply. R1 will award funds from the Surface Transportation Block Grant Program (STBG), which includes the set aside for Transportation Alternatives, as well as the Carbon Reduction Program (CRP).

Funding decisions for this project solicitation will be informed by the project selection criteria identified in the Policies & Procedures for the Distribution of Federal Transportation Funds

Funding for this cycle is available for fiscal years 2026 through 2029. Per the Policies & Procedures for the Distribution of Federal Transportation Funds, the total project funding awarded to a single project is capped at no more than two years of the annual suballocation per funding program. Any cost above this amount is the responsibility of the local sponsor. The amounts provided below are subject to change based on future annual allocations. 

Maximum Funding Award per Project
Surface Transportation Block Grant (STBG): $9,077,398 
Transportation Alternative Program (TAP): $1,245,382
Carbon Reduction Program (CRP): $1,265,254

Applications are due by Friday, November 29, 2024 at 4:30 PM CST

For application support or general questions, please email: sturner@r1planning.org.
 
Part 1. Applicant Information
This question requires a valid email address.
This question requires a valid email address.
Part 2. Project Information
13. Activity Type
To determine the primary activity, the agency should consider what activity accounts for the largest portion of the costs or addresses the projects purpose and need most directly.
17. If you are submitting multiple applications, please rank your applications by priority. 
Part 3. Cost Estimate & Funding Request
This question requires a valid currency format.
This question requires a valid currency format.
21. Has your agency previously applied for MPO-attributable funds for this project?
22. Has your agency previously been awarded funds for this project?
This question requires a valid currency format.
22. Complete all cells to show total project cost. 
*Utility relocation, construction engineering, and construction are eligible for funding at a maximum ratio of 80% federal funds to 20% non-federal funds. Right‐of‐way acquisition are eligible for funding at a maximum ratio of 50% federal funds to 50% non-federal funds. This question requires a valid currency format.
Space Cell MPO-Attributable FederalOther Federal FundsStateLocalOtherTotal
Right-of-Way
Construction
Construction Engineering
Procurement
Total
23. List each non-federal funding source (private, local, state, or sub-regional) and contribution amount.
 
Space Cell SourceAmount
Match Source #1
Match Source #2
Match Source #3
Match Source #4
24. Would a project award less than the request in this application be acceptable while maintaining the original intent of the project?
25. Has this project been incorporated into other Federal-aid grant applications?
Part 4. Current & Proposed Conditions
26. Traffic Lanes
Space Cell CurrentProposed
Number of Through Lanes
Width of Through Lanes
27. Roadway Geometrics/Characteristics
Space Cell CurrentProposedN/A
Left Turn Lanes
Dual Left Turn Lanes
Right Turn Lanes
Continuous Center Turn Lane
Depressed Median
Closed Median
Painted or Flushed
Raised Median
Paved Shoulder
Unpaved Shoulder
Curb & Gutter
On-Street Parking - One Side
On-Street Parking - Both Sides
On-Street Parking - Intermittent
28. Transportation Enhancement Components
Space Cell CurrentProposedN/A
Sidewalks - One Side
Sidewalks - Both Sides
Sidewalks - Intermittent
Sidewalks - One Side, w. Shared Use Path - One Side
Shared Use Path - One Side
Shared Use Path - Both Sides
Sharrows - One Side
Sharrows - Both Sides
Bike Lane - One Side
Bike Lane - Both Sides
Separated Bike Lane - One Side
Separated Bike Lane - Two Sides
Two-Way Cycle Track
Unsignalized Marked Crosswalks
High-Visibility Crosswalks
Raised Crosswalks
Signalized Crosswalks
Bus Stop, including Paved Waiting Area
Bus Shelter
Bump-outs at Stops
Lighting
Landscaping
Part 5. Evaluation Information
30. System Performance: Which of the following operational improvements included in project. (Check all that apply)
 
31. Safety: Which of the following FHWA Proven Countermeasures will this project incorporate? (Check all that apply)
  • * This question is required.
32. Multimodal Connectivity: What modes will the project improvements directly address? (Check all that apply)
*Just a bus route running through does not qualify.
33. Economic Vitality: Is the project located in, intersect with, or improves access to (within a 2-mile radius) a planned or existing development?
34. Environmental Resiliency: Which of the following green infrastructure, emissions reduction, and hazard mitigation strategies will this project incorporate? (Check all that apply)
  • * This question is required.
35. Investment & Coordination: Will this project be implemented in partnership with any other organizations?
36. Investment & Coordination: Does this project complete a similar transportation project completed in the last 5 years?
37. Project Readiness: For each phase, select the option that most fully describes the status of your project. If awarded, the earliest you can expect funding for your project is September of this year.
Space Cell Not applicableNot startedWill be started before awardWill be complete before awardComplete
PE/Design
NEPA
Right-of-Way
Utility Relocation