Skip survey header

K Ingleside Rapid Project Survey - All Languages

The K Ingleside Rapid Project proposes improvements on Ocean Avenue between Junipero Serra Boulevard and the Balboa Park BART Station. It advanced as a priority project through the Ocean Avenue Mobility Action Plan process and could include several types of improvements to improve the K Ingleside’s capacity, travel times, accessibility and traffic safety on Ocean Avenue. 

Review the project proposal and share your feedback through this survey to help us refine the proposal: 

1. What is your relationship with the Ingleside neighborhood? Select all that apply.  *This question is required.
  • * This question is required.
2. How do you get around on Ocean Avenue in a typical week? Select all that apply.  *This question is required.
  • * This question is required.
  • * This question is required.
3. Which of the following is your top priority for improvements on the K Ingleside?  *This question is required.
3. What is the main reason you do not use the K Ingleside as your main mode of transportation?   *This question is required.
3. If K Ingleside service and/or amenities were improved, how likely are you to ride the train more than you currently do?  *This question is required.
3. Which transit and safety goals for the Ingleside district are most important to you? Select up to three options.  *This question is required.
4. Thinking about traffic safety, how safe do you feel traveling on Ocean Avenue in Ingleside?  *This question is required.
Would you support the following transit and safety improvements?
5. At the San Leandro stop, longer boarding islands to double train capacity and improve reliability and boarding safety *This question is required.
6. At the Aptos stop, longer boarding islands to double train capacity and improve reliability and boarding safety  *This question is required.
7. At the Fairfield stop, longer boarding islands to double train capacity and improve reliability and boarding safety *This question is required.
8. At the Miramar stop, longer boarding islands at train stops to double train capacity and improve reliability and boarding safety *This question is required.
9. Traffic signals that stay green longer on Ocean Avenue to keep trains moving, improve reliability and travel times  *This question is required.
10. Wider sidewalks at corners (“bulb outs”) to improve safety for people walking at the southeast corner of Ocean and San Benito *This question is required.
11. Wider sidewalks at corners (“bulb outs”) to improve safety for people walking at the northeast corner of Ocean and Manor *This question is required.
12. Wider sidewalks at corners (“bulb outs”) to improve safety for people walking at the southeast corner of Ocean and Westgate and northwest corner of Ocean and Cerritos *This question is required.
13. Dedicated transit lane on Ocean Avenue to improve travel times and reliability (general traffic may still enter the lane to make left turns)   *This question is required.
14. Removing the lower ridership train stop at Ocean Avenue and Cerritos Avenue/Westgate Drive to improve travel times and reliability due to lack of space for a full boarding island (the stop one block away at Aptos Avenue would remain)  *This question is required.
15. Providing a lagging left turn phase at eastbound Ocean Avenue and Brighton Way to improve traffic flow, travel time and reliability while maintaining access to the Whole Foods Market (left turns from westbound Ocean Avenue would be restricted) *This question is required.