Skip survey header

Electric Utility Load Profile

This question requires a valid date format of MM/DD/YYYY.
calendar
4. Load DataAll load data should be in kW.
Space Cell Single Phase Connected LoadEstimated Demand LoadThree Phase Connected LoadEstimated Demand Load
Indoor Lighting
Outdoor Lighting
Motor Load
Electrical Heat
Air Conditioning
Kitchen Equipment
Refrigeration
Compressor
Receptacles
Other
Subtotal
Existing Loads
Total
Largest Motor
5. Temporary Service
Will a temporary service be required?
This question requires a valid date format of MM/DD/YYYY.
calendar
6. Permanent Service Characteristics
Voltage
Phase
Amps
Wire Type
This question requires a valid date format of MM/DD/YYYY.
calendar
7. Please upload plot plan designating preferred point of delivery.Accepted file types: png, gif, jpg, jpeg, doc, docx, pdf
I.E. meter/equipment specifications, etc.