Commercial Construction Request

1. Contact Information
Contact Role
This question requires a valid email address.
2. Mailing Address
This question requires a valid number format.
Required method of contact is email.
3. Customer Responsible
4. Third Party Contact (Contractor/Electrician)
Email is used for communication in regards to requested work (I.E. moving through steps in process, estimation quotes, etc.)
5. Project Location
This question requires a valid number format.
Is this a multiple-unit building? *This question is required.
Legal Description
6. Contractor Information
Space Cell General ContractorElectrical ContractorArchitect (A&E Firm)Mechanical Contractor
Company
Phone Number
Contact Person
7. Billing InformationEntity responsible to pay for electric usage AFTER construction (permanent service)
Existing Minnesota Power Customer *This question is required.
This question requires a valid email address.
Tax Exempt?If yes, send copy of ST3 Exemption
8. Temporary Service Size
Will a temporary service be required? *This question is required.
This question requires a valid date format of MM/DD/YYYY.
calendar
Service Information
This question requires a valid date format of MM/DD/YYYY.
Billing InformationEntity responsible to pay for electric usage DURING construction (temporary service)
Existing Minnesota Power Customer *This question is required.
This question requires a valid email address.
Tax Exempt?If yes, send copy of ST3 Exemption
9. Electrical Engineer/Electrician's Information
This question requires a valid date format of MM/DD/YYYY.
calendar
Voltage *This question is required.
Phase *This question is required.
Electric Utility Load ProfileTo be completed by an electrician or electrical engineer
Space Cell Single Phase Connected Load (kW)Estimated Demand Load (kW)
Indoor Lighting
Outdoor Lighting
Motor Load
Electrical Heal
Air Conditioning
Kitchen Equipment
Refrigeration
Compressor
Receptacles
Other
Subtotal
Existing Loads
Total *This question is required
Electric Utility Load ProfileTo be completed by an electrician or electrical engineer
Space Cell Three Phase Connected Load (kW)Estimated Demand Load (kW)
Indoor Lighting
Outdoor Lighting
Motor Load
Electrical Heal
Air Conditioning
Kitchen Equipment
Refrigeration
Compressor
Receptacles
Other
Subtotal
Existing Loads
Total *This question is required
Largest Motor
Amps
Metering *This question is required.
This question requires a valid date format of MM/DD/YYYY.
calendar
10. Heating and Cooling Options
Is the owner interested in the following electric heating options? If unsure; contact us at 218-355-2843 or DualFuelSupport@mnpower.com to discuss. *This question is required.
If yes, what type of electric heating system will be installed? *This question is required.
  • Electric Heating System(s)
  • Non-Electric Heating System(s)
  • Non-Electric Fuel(s)
11. Electric Vehicle *This question is required.
Electric Vehicle Charging *This question is required.
12.

Certified Survey Map or Site Plan

*This question is required.

Customers must provide a certified survey map or a detailed site plan noting the following:

  • Where the new structure will be located
  • Location of existing structures
  • Distance (feet) structure will be located from roadway
  • Location of proposed/existing driveway (note if matting has been installed)
  • Location of well lines, sewer lines, or other potential obstructions
  • Location of electric panel (service entrance)
  • Neighboring address and/or nearest intersecting road

A complete application, along with good communication with your Minnesota Power representative, is the best way to keep your project on track. All information requested shall be completed in its entirety. Incomplete applications will be returned and will cause delays until a complete application has been received.

By signing and completing this application I am certifying I understand and agree to the following:

Any deviation from the electrical design, once established, may result in additional costs for redesign and delays in construction.

Services agreed upon in this application are required to stay in service for a minimum of five years. Customer will be liable for costs to remove Minnesota Power equipment if the five year minimum is not met.

I have read Your Commercial Electric Service at: https://www.mnpower.com/CustomerService/CommercialConstruction

13. Authorization *This question is required.
Clear
Signature of
This question requires a valid date format of MM/DD/YYYY.
calendar