Skip survey header

PDM Pre-Task Plan

PDM Constructors: Pre-Task Plan

4. Total Manpower on site:
5. Is there a Pre-Task Plan Board on site reflecting today's date that details ongoing tasks and a detailed plan to accomplish each task while prioritizing safety?
If yes, you will be asked to upload a photo of the board. If no, you will be asked to submit the plan digitally. *This question is required.
6. Please upload a photo of the updated Pre-Task Plan Board marked with today's date and activites. *This question is required.
6. Please consider the work to be performed and check 'Yes' or 'No' *This question is required.
Space Cell YesNo
Does every crew member know how to use assigned tools & equipment?
Does this work require special training?
Do you need additional or special personnel to complete this task?
Do you need additional or special materials and tools to do the job?
Do you need to review an MSDS to proceed with this work?
Is there adequate lighting and access?
Will weather conditions affect the safety or quality of this work?
Does this task require shutdown of systems or equipment?
Is there any potential to impact existing Owner or Construction activities?
Are there occupied spaces adjacent or below?
Have shop drawings, contract drawings, and As-builts been reviewed?
Will there be any discharge of fluids?
Do other subs need to be involved?
Does this task require any special permits or procedures?
Employees are assigned a "buddy?"
Crew knows the location of fire extinguishers, eye washes, and phones?
Work involves awkward positions, heavy or repetitive lifting?
Do you know where the nearest Worknet location is?
Do you have a rescue plan?
6. Check if any of the following apply: *This question is required.
  • * This question is required.
6. Construction Activities
Space Cell Construction Activity (In Sequence)Hazards IdentifiedPreparation
1
2
3
4
5
6. Upload any applicable backup documentation:
7. The tasks have reviewed in the work area where they will be performed and this plan has been reviewed with the workers on this crew.

Foreman Signature: *This question is required.
Foreman Signature *This question is required.
Clear
Signature of
8. Crew Sign-in
Clear
Signature of
9. Crew Sign-in
Clear
Signature of
10. Crew Sign-in
Clear
Signature of
11. Crew Sign-in
Clear
Signature of
12. Crew Sign-in
Clear
Signature of
13. Crew Sign-in
Clear
Signature of
14. Crew Sign-in
Clear
Signature of
15. Crew Sign-in
Clear
Signature of
16. Crew Sign-in
Clear
Signature of
17. Crew Sign-in
Clear
Signature of